| Miejsce | El Salvador |
|---|---|
| Rok | 2023 |
| Typ | Commemorative medal |
| Skład | Silver (.925) plated copper |
| Waga | 33 g |
| Średnica | 40 mm |
| Grubość | 3 mm |
| Kształt | Round |
| Technika | Milled |
| Orientacja | Medal alignment ↑↑ |
| Krawędź | Serial Number |
| Okres | Republic (1841-date) |
| Uwagi | |
| Źródło(a) |
| Opis awersu | The section of the vertical shaft francis turbine, spiral case, runner, distributor and draft tube can be observed. Design of russian origin and each unit with a power of 33 MW. G08 is the power plant code in the energy market in El Salvador. |
|---|---|
| Pismo awersu | Latin |
| Legenda awersu | PROYECTO HIDROELÉCTRICO EL CHAPARRAL - CENTRAL HIDROELÉCTRICA 3 DE FEBRERO |
| Opis rewersu | The reservoir and the dam of the hydroelectric power plant. |
| Pismo rewersu | Latin |
| Legenda rewersu | EL SALVADOR 2023 |
| Nakład | |
| ID Numisquare | 3876117930 |
| Uwagi |
|