Medal - Inauguration Central Hidroeléctrica 3 de Febrero Finalización Proyecto Hidroeléctrico El Chaparral

Ort El Salvador
Jahr 2023
Typ Commemorative medal
Material Silver (.925) plated copper
Gewicht 33 g
Durchmesser 40 mm
Dicke 3 mm
Form Round
Herstellungstechnik Milled
Ausrichtung Medal alignment ↑↑
Rand Serial Number
Epoche Republic (1841-date)
Hinweis
Referenz(en)
Aversbeschreibung The section of the vertical shaft francis turbine, spiral case, runner, distributor and draft tube can be observed. Design of russian origin and each unit with a power of 33 MW. G08 is the power plant code in the energy market in El Salvador.
Aversschrift Latin
Averslegende PROYECTO HIDROELÉCTRICO EL CHAPARRAL - CENTRAL HIDROELÉCTRICA 3 DE FEBRERO
Reversbeschreibung The reservoir and the dam of the hydroelectric power plant.
Reversschrift Latin
Reverslegende EL SALVADOR 2023
Auflage
Numisquare-ID 3876117930
Anmerkungen
×