Popis líce The section of the vertical shaft francis turbine, spiral case, runner, distributor and draft tube can be observed. Design of russian origin and each unit with a power of 33 MW. G08 is the power plant code in the energy market in El Salvador.
Písmo líce Latin
Opis líce PROYECTO HIDROELÉCTRICO EL CHAPARRAL - CENTRAL HIDROELÉCTRICA 3 DE FEBRERO
Popis rubu The reservoir and the dam of the hydroelectric power plant.
Písmo rubu Latin
Opis rubu EL SALVADOR 2023