| Místo | El Salvador |
|---|---|
| Rok | 2023 |
| Typ | Commemorative medal |
| Složení | Silver (.925) plated copper |
| Hmotnost | 33 g |
| Průměr | 40 mm |
| Tloušťka | 3 mm |
| Tvar | Round |
| Technika | Milled |
| Orientace | Medal alignment ↑↑ |
| Hrana | Serial Number |
| Období | Republic (1841-date) |
| Poznámka | |
| Reference |
| Popis líce | The section of the vertical shaft francis turbine, spiral case, runner, distributor and draft tube can be observed. Design of russian origin and each unit with a power of 33 MW. G08 is the power plant code in the energy market in El Salvador. |
|---|---|
| Písmo líce | Latin |
| Opis líce | PROYECTO HIDROELÉCTRICO EL CHAPARRAL - CENTRAL HIDROELÉCTRICA 3 DE FEBRERO |
| Popis rubu | The reservoir and the dam of the hydroelectric power plant. |
| Písmo rubu | Latin |
| Opis rubu | EL SALVADOR 2023 |
| Náklad | |
| ID Numisquare | 3876117930 |
| Poznámky |
|