| محل | El Salvador |
|---|---|
| سال | 2023 |
| نوع | Commemorative medal |
| ترکیب | Silver (.925) plated copper |
| وزن | 33 g |
| قطر | 40 mm |
| ضخامت | 3 mm |
| شکل | Round |
| تکنیک | Milled |
| جهت | Medal alignment ↑↑ |
| لبه | Serial Number |
| دوره | Republic (1841-date) |
| توضیح | |
| مرجع(ها) |
| توضیحات روی مدال | The section of the vertical shaft francis turbine, spiral case, runner, distributor and draft tube can be observed. Design of russian origin and each unit with a power of 33 MW. G08 is the power plant code in the energy market in El Salvador. |
|---|---|
| خط روی مدال | Latin |
| نوشتههای روی مدال | PROYECTO HIDROELÉCTRICO EL CHAPARRAL - CENTRAL HIDROELÉCTRICA 3 DE FEBRERO |
| توضیحات پشت مدال | The reservoir and the dam of the hydroelectric power plant. |
| خط پشت مدال | Latin |
| نوشتههای پشت مدال | EL SALVADOR 2023 |
| تیراژ ضرب | |
| شناسه Numisquare | 3876117930 |
| یادداشتها |
|