| Locatie | El Salvador |
|---|---|
| Jaar | 2023 |
| Type | Commemorative medal |
| Samenstelling | Silver (.925) plated copper |
| Gewicht | 33 g |
| Diameter | 40 mm |
| Dikte | 3 mm |
| Vorm | Round |
| Techniek | Milled |
| Oriëntatie | Medal alignment ↑↑ |
| Rand | Serial Number |
| Periode | Republic (1841-date) |
| Opmerking | |
| Referentie(s) |
| Beschrijving voorzijde | The section of the vertical shaft francis turbine, spiral case, runner, distributor and draft tube can be observed. Design of russian origin and each unit with a power of 33 MW. G08 is the power plant code in the energy market in El Salvador. |
|---|---|
| Schrift voorzijde | Latin |
| Opschrift voorzijde | PROYECTO HIDROELÉCTRICO EL CHAPARRAL - CENTRAL HIDROELÉCTRICA 3 DE FEBRERO |
| Beschrijving keerzijde | The reservoir and the dam of the hydroelectric power plant. |
| Schrift keerzijde | Latin |
| Opschrift keerzijde | EL SALVADOR 2023 |
| Oplage | |
| Numisquare-ID | 3876117930 |
| Opmerkingen |
|