目录
为什么需要注册?只是为了防止机器人访问我们的目录。您的邮箱完全保密——我们绝不会分享或在未经您许可的情况下发送任何内容。我们向您保证!
| 正面描述 | 登录 以查看详情 |
|---|---|
| 正面文字 | 登录 以查看详情 |
| 正面铭文 | 登录 以查看详情 |
| 背面描述 | A multi-arched bridge spanning a river, depicted in profile with eight supporting piers and a flat roadway above; the structure is generally identified as the Bridge of Apollodorus over the Danube, constructed during Trajan's Dacian campaigns. A small boat or vessel is visible beneath the bridge in the lower right portion of the field. The reverse legend S P Q R OPTIMO PRINCIPI appears in the upper field, honoring Trajan as the Senate and People of Rome's finest ruler. The senatorial authorization mark SC (Senatus Consulto) is placed in the lower exergue area. The overall design closely replicates the sestertius type attributed to the Roman Imperial mint at Rome, struck circa 103–111 AD. |
| 背面文字 | Latin |
| 背面铭文 | 登录 以查看详情 |
| 边缘 | 登录 以查看详情 |
| 铸币厂 | 登录 以查看详情 |
| 铸造量 | 登录 以查看详情 |
| 附加信息 |
Trajan's Danube bridge, completed around 105 AD under the engineer Apollodorus of Damascus, was the longest arch bridge the ancient world would see for over a thousand years — spanning roughly 1,135 meters on 20 stone piers. The original sestertius commemorating it is among the most historically loaded bronze issues of the Principate, struck to mark the infrastructure that made the second Dacian campaign logistically possible.
This is a modern replica. The brass composition confirms it immediately; ancient sestertii were struck in orichalcum, a zinc-rich brass alloy whose precise formulation was lost well before the third century.