Catalogus
Waarom registreren? Alleen om bots buiten ons catalogus te houden. Uw e-mail blijft privé — we delen het nooit en sturen u niets zonder uw toestemming. Dat garanderen wij u!
| Uitgever | Central Bank of Egypt |
|---|---|
| Jaar | 2015 |
| Type | Log in om details te zien |
| Waarde | 1 Pound |
| Valuta | Log in om details te zien |
| Samenstelling | Log in om details te zien |
| Gewicht | Log in om details te zien |
| Diameter | Log in om details te zien |
| Dikte | Log in om details te zien |
| Vorm | Log in om details te zien |
| Techniek | Log in om details te zien |
| Oriëntatie | Log in om details te zien |
| Graveur(s) | Log in om details te zien |
| In omloop tot | Log in om details te zien |
| Referentie(s) | Log in om details te zien |
| Beschrijving voorzijde | The obverse features the country name 'Arab Republic of Egypt' (جمهورية مصر العربية) inscribed as the upper legend within the brass-coloured central disc. The denomination '1 جنيه' (1 Pound) is displayed prominently in the field, with the English legend 'ONE POUND' below. The Gregorian year '٢٠١٥م' (2015 AD) and the Hijri year '١٤٣٦هـ' (1436 AH) are both rendered in Arabic numerals, reflecting the dual-calendar tradition of Egyptian coinage. |
|---|---|
| Schrift voorzijde | Log in om details te zien |
| Opschrift voorzijde | جمهورية مصر العربية 1 جنيه ٢٠١٥م ONE POUND ١٤٣٦هـ (Translation: Arab Republic of Egypt 1 Pound AD 2015 ONE POUND AH 1436) |
| Beschrijving keerzijde | Log in om details te zien |
| Schrift keerzijde | Log in om details te zien |
| Opschrift keerzijde | Log in om details te zien |
| Rand | Log in om details te zien |
| Muntplaats | Log in om details te zien |
| Oplage | Log in om details te zien |
| Aanvullende informatie |
Issued to mark the opening of the New Suez Canal in August 2015 — a parallel channel excavated in just one year through an accelerated dredging program ordered by President el-Sisi, who framed the project as a national rebirth following years of post-revolution instability. Egypt covered the $8.5 billion construction cost entirely through domestic investment certificates, refusing foreign financing as a deliberate political statement.
The project added a 35-kilometer bypass along the northern section, reducing southbound transit waiting times from roughly 18 hours to 11.