目录
为什么需要注册?只是为了防止机器人访问我们的目录。您的邮箱完全保密——我们绝不会分享或在未经您许可的情况下发送任何内容。我们向您保证!
| 正面描述 | Central depiction in relief of the Maqta Bridge with its distinctive arched truss structure, flanked by two crossed flags above. Arabic legend surrounds the design, with contractor names Kettaneh (Lebanon) and Skanska (Sweden) below the bridge, and dual dates (6 August 1968 / 12 Jumada al-Awwal 1388) along the lower field. |
|---|---|
| 正面文字 | Arabic |
| 正面铭文 | 登录 以查看详情 |
| 背面描述 | Central depiction in relief of the Maqta Bridge with its distinctive arched truss structure, flanked by two crossed flags above. English legend surrounds the design, reading along the upper arc the dedication to His Highness Sheikh Zayed Bin Sultan Al Nahyan, with contractor names Skanska (Sweden) and Kettaneh (Lebanon) below the bridge, consultants Cansult Canada, and along the lower arc the inauguration inscription for Muqta'a Bridge, Abu Dhabi, with dual dates on either side. |
| 背面文字 | 登录 以查看详情 |
| 背面铭文 | 登录 以查看详情 |
| 铸造机构 | 登录 以查看详情 |
| 铸造量 | 登录 以查看详情 |
| 备注 | 登录 以查看详情 |