| Luogo | El Salvador |
|---|---|
| Anno | 2023 |
| Tipo | Commemorative medal |
| Composizione | Copper |
| Peso | 33 g |
| Diametro | 40 mm |
| Spessore | 3 mm |
| Forma | Round |
| Tecnica | Milled |
| Orientamento | Medal alignment ↑↑ |
| Bordo | Serial Number |
| Periodo | |
| Nota | |
| Riferimento/i |
| Descrizione del dritto | The section of the vertical shaft francis turbine, spiral case, runner, distributor and draft tube can be observed. Design of russian origin and each unit with a power of 33 MW. G08 is the power plant code in the energy market in El Salvador. |
|---|---|
| Scrittura del dritto | Latin |
| Legenda del dritto | PROYECTO HIDROELÉCTRICO EL CHAPARRAL - CENTRAL HIDROELÉCTRICA 3 DE FEBRERO |
| Descrizione del rovescio | The reservoir and the dam of the hydroelectric power plant. |
| Scrittura del rovescio | Latin |
| Legenda del rovescio | EL SALVADOR 2023 |
| Tiratura | |
| ID Numisquare | 8879641630 |
| Commenti |
|