目录
为什么需要注册?只是为了防止机器人访问我们的目录。您的邮箱完全保密——我们绝不会分享或在未经您许可的情况下发送任何内容。我们向您保证!
| 正面描述 | In the upper half of the field, a relief depiction of an electric locomotive beneath overhead catenary wires; in the lower half, a railway control operator seated at a control panel, with the dates 1957 and 1964 flanking the central dividing line. The circular legend runs along the rim, and the designer's signature 'A. SICHEL' appears in small relief in the lower right field. |
|---|---|
| 正面文字 | 登录 以查看详情 |
| 正面铭文 | 登录 以查看详情 |
| 背面描述 | The upper field displays two heraldic shields in relief: the coat of arms of Chile on the left and the emblem of the Gruppo Aziende Italiane on the right. Below, a multi-line inscription in raised letters covers the remainder of the field, recording the inauguration details including the names of the Chilean President and the Railway Director, the participating Italian industrial group, and the date. |
| 背面文字 | Latin |
| 背面铭文 | 登录 以查看详情 |
| 铸造机构 | 登录 以查看详情 |
| 铸造量 | 登录 以查看详情 |
| 备注 | 登录 以查看详情 |