Volledige afbeeldingen bekijken — gratis registratie
Doorgaan met Google — het is gratis of registreer met e-mail

Waarom registreren? Alleen om bots buiten ons catalogus te houden. Uw e-mail blijft privé — we delen het nooit en sturen u niets zonder uw toestemming. Dat garanderen wij u!

5 Manat TANAP

Uitgever Central Bank of the Republic of Azerbaijan
Jaar 2016
Type Log in om details te zien
Waarde Log in om details te zien
Valuta Log in om details te zien
Samenstelling Log in om details te zien
Gewicht Log in om details te zien
Diameter Log in om details te zien
Dikte Log in om details te zien
Vorm Round
Techniek Log in om details te zien
Oriëntatie Log in om details te zien
Graveur(s) Log in om details te zien
In omloop tot Log in om details te zien
Referentie(s) Log in om details te zien
Beschrijving voorzijde At center, the national coat of arms of Azerbaijan is depicted within a circular frame, featuring an eight-pointed star with a flame motif and wreath at its base. To the left, a large crescent and geometric ornamental motifs occupy the field in a stylized composition. The legend 'AZƏRBAYCAN RESPUBLİKASI' arcs along the upper periphery, while the denomination '5 MANAT' appears in the lower exergue. Small star ornaments flank the denomination at either side.
Schrift voorzijde Latin
Opschrift voorzijde Log in om details te zien
Beschrijving keerzijde Log in om details te zien
Schrift keerzijde Log in om details te zien
Opschrift keerzijde Log in om details te zien
Rand Log in om details te zien
Muntplaats Log in om details te zien
Oplage Log in om details te zien
Aanvullende informatie

TANAP — the Trans-Anatolian Natural Gas Pipeline — was formally agreed between Azerbaijan and Turkey in 2012, with construction beginning in 2015. The pipeline was designed to carry Azerbaijani gas from the Shah Deniz II field across Turkey toward Europe, a project with obvious strategic implications for both Ankara and Brussels as each sought to diversify away from Russian supply. This coin was issued the year active construction was underway, before the line's completion in 2018.

MISSCHIEN OOK INTERESSANT