目录
为什么需要注册?只是为了防止机器人访问我们的目录。您的邮箱完全保密——我们绝不会分享或在未经您许可的情况下发送任何内容。我们向您保证!
| 正面描述 | 登录 以查看详情 |
|---|---|
| 正面文字 | 登录 以查看详情 |
| 正面铭文 | 登录 以查看详情 |
| 背面描述 | Central field presents a detailed aerial cartographic view of the expanded Panama Canal locks complex, rendered in high relief with selective gold plating highlighting the lock chambers, approach channels, and surrounding infrastructure. The lock gates and water basins are clearly delineated, conveying the engineering scale of the canal expansion project. The legend VEINTE BALBOAS curves along the upper periphery, while the inscription AMPLIACIÓN DEL CANAL DE PANAMÁ 2007-2016 arcs along the lower border, recording the dates of the expansion project. The outer border ring is gold-plated, framing the frosted silver central design. |
| 背面文字 | Latin |
| 背面铭文 | 登录 以查看详情 |
| 边缘 | Reeded |
| 铸币厂 | 登录 以查看详情 |
| 铸造量 | 登录 以查看详情 |
| 附加信息 | 登录 以查看详情 |