目录
| 正面描述 | 登录 以查看详情 |
|---|---|
| 正面文字 | Cyrillic, Latin |
| 正面铭文 | 登录 以查看详情 |
| 背面描述 | The reverse presents a colorized panoramic view of the Rogun Hydropower Plant construction site, depicting the massive arch dam set within a dramatic mountain gorge, with vivid blue water visible in the reservoir and at the base of the structure. In the foreground and middle ground, a series of tall electricity transmission pylons are rendered in fine relief against the rocky landscape. The Cyrillic legend '• ОҒОЗИ КОРИ НБО-и РОҒУН •' arcs along the upper left periphery, and the Latin legend 'LAUNCH OF ROGUN HPP •' continues along the upper right, both on a dark polished ground. The date '16.11.2018' is inscribed along the lower periphery, commemorating the official launch of the hydroelectric power station. |
| 背面文字 | 登录 以查看详情 |
| 背面铭文 | • ОҒОЗИ КОРИ НБО-и РОҒУН • LAUNCH OF ROGUN HPP • 16.11.2018 (Translation: Starting Rogun Hydroelectric Power Station) |
| 边缘 | 登录 以查看详情 |
| 铸币厂 | 登录 以查看详情 |
| 铸造量 | 登录 以查看详情 |
| 附加信息 | 登录 以查看详情 |