Plain, with incuse lettering in German Script: Latin
Period
Oriental Republic of
Uruguay (1825-date)
Notice
Reference(s)
Obverse description
Drawing of Rincón de Baygorria dam, placed on Río Negro for production of electricity. Installations description above, UTE (Uruguayan electricity enterprise) logo below.
Obverse lettering
USINA
EN EL RINCÓN
DE BAYGORRIA
RÍO NEGRO
UTE (Translation: Electricity generator at Rincón de Baygorria, Río Negro UTE= Usinas y Teléfonos del Estado= State Generators and Telephones.)
Obverse script
Latin
Reverse description
All text. Description of installation and date on center, names of involved factories around
Reverse lettering
SIEMENS-SCHUCKERTWERKE SIEMENS-AUUNION PH.HOLZMANN
GRÜN&BILFINGER
1.
GRUPO
34000 KW
JULIO
1960 (Translation: July 1960)