Medal - Inauguration Central Hidroeléctrica 3 de Febrero Finalización Proyecto Hidroeléctrico El Chaparral

€467,816.00
LocationEl Salvador
Year2023
TypeCommemorative medals/Inauguration medals
CompositionCopper
Weight33 g
Diameter40 mm
Thickness3 mm
ShapeRound
TechniqueMilled
OrientationMedal alignment ↑↑
EdgeSerial Number
Period
NoticeAnsen Crafts
Reference(s)
Obverse descriptionThe section of the vertical shaft francis turbine, spiral case, runner, distributor and draft tube can be observed. Design of russian origin and each unit with a power of 33 MW. G08 is the power plant code in the energy market in El Salvador.
Obverse letteringPROYECTO HIDROELÉCTRICO EL CHAPARRAL - CENTRAL HIDROELÉCTRICA 3 DE FEBRERO
Obverse scriptLatin
Reverse descriptionThe reservoir and the dam of the hydroelectric power plant.
Reverse letteringEL SALVADOR 2023
Reverse scriptLatin
Engraver
Mintage2023  - - 25
Catalog ID8879641630
Comments