Medal - Inauguration Central Hidroeléctrica 3 de Febrero Finalización Proyecto Hidroeléctrico El Chaparral
Medal - Inauguration Central Hidroeléctrica 3 de Febrero Finalización Proyecto Hidroeléctrico El Chaparral
€467,816.00
Location
El Salvador
Year
2023
Type
Commemorative medals/Inauguration medals
Composition
Copper
Weight
33 g
Diameter
40 mm
Thickness
3 mm
Shape
Round
Technique
Milled
Orientation
Medal alignment ↑↑
Edge
Serial Number
Period
Notice
Ansen Crafts
Reference(s)
Obverse description
The section of the vertical shaft francis turbine, spiral case, runner, distributor and draft tube can be observed. Design of russian origin and each unit with a power of 33 MW. G08 is the power plant code in the energy market in El Salvador.
Obverse lettering
PROYECTO HIDROELÉCTRICO EL CHAPARRAL - CENTRAL
HIDROELÉCTRICA 3 DE FEBRERO
Obverse script
Latin
Reverse description
The reservoir and the dam of the hydroelectric power plant.