Medal - Inauguration Central Hidroeléctrica 3 de Febrero Finalización Proyecto Hidroeléctrico El Chaparral

€1.00
LocationEl Salvador
Year2023
TypeCommemorative medal
CompositionSilver (.925) plated copper
Weight33 g
Diameter40 mm
Thickness3 mm
ShapeRound
TechniqueMilled
OrientationMedal alignment ↑↑
EdgeSerial Number
PeriodRepublic (1841-date)
NoticeAnsen Crafts
Reference(s)
Obverse descriptionThe section of the vertical shaft francis turbine, spiral case, runner, distributor and draft tube can be observed. Design of russian origin and each unit with a power of 33 MW. G08 is the power plant code in the energy market in El Salvador.
Obverse letteringPROYECTO HIDROELÉCTRICO EL CHAPARRAL - CENTRAL HIDROELÉCTRICA 3 DE FEBRERO
Obverse scriptLatin
Reverse descriptionThe reservoir and the dam of the hydroelectric power plant.
Reverse letteringEL SALVADOR 2023
Reverse scriptLatin
Engraver
Mintage2023  - - 115
Catalog ID3876117930
Comments